This Standard sets out the method for determining the lime or cement content of pavement materials mixed with lime or cement which are sampled from a project under construction and tested within a limited period after the completion of mixing.
Original price was: $36.30.$18.00Current price is: $18.00.
Methods for preparation and testing of stabilized materials, Method 3.1: Lime or cement content of uncured stabilized pavement materials (EDTA method)
Standards Australia , 06/19/2008
Pages: 5


